Progress and matching resources in Knowledge Hub
Governance delivery pilot
Prioritize source, lock scope and KPIs, mart design and controls — through signoff.
Start as sprint plan Opens the Sprint Planner with a matching template.
Related roles
-
1. Prerequisite: intake
Stack, authority, and gap register before the pilot.
-
2. Prioritize source
Decision value and source readiness instead of connector order.
-
3. Read proof pattern
End-to-end from portfolio decision to pilot mart.
-
4. Scope, KPI, mart, PII
Produce standard artifacts with generators.
-
5. Adoption and signoff
Scorecards separate operations, adoption, and coverage.
-
6. Start the plan
Run the pilot as a sprint instance.