Dashboard and report design deep dive
One surface for one decision: type, scan or sheet or alert, design gate before promotion.
Start as sprint plan Opens the Sprint Planner with a matching template.
Related roles
-
1. Read the series
Surface type, scan path, paginated, alerting, design gate.
-
2. One surface
Type one decision and hang the design gate on the publish contract.
-
3. Next: publish and dashboard operating
Stage stays publish; checklist cadence stays dashboard operating.